SINOCTM is located in Ji′Nan city, Shandong province, SINOCTM aims to provide the project solutions with best cost performance to customers from China and abroad. Our main business are construction solutions consultancy, equipments supply, technical instruction, parts supply, service & training, logistic support and etc, providing the steward type service.
We cooperate with SINOTRUK, FOTON, SDLG, XCMG, Liugong, Shantui, Sany, Zoomlion, Hongda and other premium brands to provide tailored project solutions to your specific needs. We can help you to avoid long-time communication with different suppliers, which will save you time and cost. As to after market, with many years′ experience in the industry and long-term partnership with the suppliers, we do provide timely after market with lower cost and higher availability.
XGT7020-12 TOPLESS TOWER CRANE | |||||
Basic height | 60M | ||||
Max height | 240M | ||||
Length | 70/65/60/55/50/45/40/35/30 | ||||
Max load | 12t | ||||
Tip load | 2/2.5/3.1/3.9/4.7/5.6/6.3/7.2/8.5 | ||||
Section size | 2000×2000×3000 | ||||
Section material | Angle steel/Folding | ||||
XGT7020-12 | |||||
Items | Mechanism | Speed(m/min) | Rope capacity | Motor(Kw) | |
Hoist mechanism | 55JLF30A | 2 multiplying power | 0-90 | 695M >695M* | 55 |
4 multiplying power | 0-45 | ||||
Trolleying mechanism | 6JXF5 | 0-63m/min | 5.5 | ||
Slewing mechanism | JH12CT6 | 0-0.66r/min | 2×7.5 | ||
Travelling | RT | 0-25m/min | 4×4 | ||
Main Supply | 380V(±10%)/50Hz* | ||||
Gross Power(Excluding climbing and travelling):75.5Kw | |||||
The manufacturer reserves the right of technical alteration /change for better improvement without prior notice |
1. The most secure high-end construction lifting machinery benchmark.
2. The lifting performance is better than competitors.
New XGT-AMCS intelligent management system.
3. With the speed control function, the position accuracy is up to millimeter; ensure that the hoisting is smooth and accurate.
4. Quick disassembly, easy and efficient, the platforms and booms are quick-assembly structures, which save 3.2 hours for installation.